Situated in Merthyr Tydfil, in the South West of Wales, the new Trago Mills store is their first located outside of Devon and Cornwall. It was a huge project, spanning over 46 acres, designed to bring more than 350 jobs to the local area. 

Read our case study below to discover how our innovative Novoform products helped to get this project off the ground. 

Project Background 

Regional discount retailer Trago Mills has been located in the South West for over 50 years. It’s new £40m retail and leisure facility is currently being built on the site of the old works in Merthyr Tydfil, adjacent to the Cyfarthfa Retail Park.  

The new 30,250m2 store incorporates many of the retailers’ signature styles including 17 of their now iconic ‘Trago Towers’. 

Project Details 

Location: Merthyr Tydfil 

Main Contractor: Kier Construction Ltd. 

Sub-Contractor: Churngold Construction Ltd. 

Product Details: 8078m2 of Novoform used  

How was Naylor Novoform involved in the project? 

Here at Naylor Novoform, we’re proud to have been involved heavily in the project from the beginning. 

  • We liaised closely with those on site and ensured accurate, carefully scheduled deliveries which helped to ensure the project was completed on time. 

  • We worked with them in the early stages on the foundation design and created bespoke panel sizes to suit their requirements. 

  • We held a large number of our Novoform panels in stock ready for call-off due to the extensive scale of the building and therefore the large quantities of Novoform required. 

  • Thanks to the speed and ease of Novoform Formwork installations, every delivery of the panels were installed efficiently and to programme. 

  • We made sure that each delivery was palletised and clearly marked for ease of identification and storage on site. 

  • Novoform also drastically reduces the amount of waste material needed to be removed from the site, due to its minimum dig requirements. 

Why Novoform?  

Due to the scope of the project undertaken, as well as the poor ground conditions at the site, Novoform was the number one choice for the project’s Formwork solution. 

  • Manufactured in the UK 

  • Extensive finished stock panels 

  • Usually delivered in 2-3 days 

  • Full take-off service with detailed quotation 

  • Dedicated on-site support available 

Discover Novoform from Naylor 

Designed specifically to reduce the time and skill required for traditional formwork systems, Novoform is the future of permanent formwork solutions. It’s extremely light, yet highly durable wire framework that’s quick and easy to install.  

With Novoform, you can ensure projects are completed on time and on budget as there’s no need for skilled labourers or training – plus it requires the need for traditional formwork removal, cleaning and storage following concrete pours. 

If you’d like to learn more about Novoform and how it could transform your next project, simply get in touch with our specialist team today! 

Give us a call on 01427 617547 or send over your questions/requirements to sales@naylor-Novoform.co.uk. 

Previous
Previous

BBC Cymru Wales HQ, Cardiff – Novoform Case Study 

Next
Next

Everton Stadium Football Club - Novoform Case Study